Florida condosMiami-Dade CountyCoral GablesGables Park Tower
Gables Park Tower, Coral Gables
A structural integrity reserve study (SIRS) is on file with the state for this 78-unit community at 357 Almeria Ave, completed December 19, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 15 floors and a 2001 construction year. The county roll lists 2003 as the year built. If its certificate of occupancy (CO) was issued in 2001, its first milestone inspection is probably due by December 31, 2031 (s. 553.899(3)(a), F.S.). A local building department can require the first inspection at 25 years: check with City of Coral Gables Development Services (Building Division).
SIRS completed December 19, 2024.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2003Declaration recorded December 5, 2003.
- 2024SIRS completed December 19, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2031First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Gables Park Tower open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 78 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | December 5, 2003 | DBPR condo file, Oct 3, 2026 |
| Year built | 2001 | Miami-Dade property roll (2003); association's SIRS filing (2001) |
| Floors | 15 | SIRS filing, self-reported |
| SIRS completed | December 19, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1G025850 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | X, minimal flood hazard | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 71 on the county roll, averaging 1,010 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 2 miles | Our calculation, TIGER 2024 |
| Association | Almeria Park Condo Assn Inc · formed September 3, 2003 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | Skrld, Inc. | Sunbiz, Jul 1, 2026 |
Owners
Owners can ask the board for Gables Park Tower's December 19, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Coral Gables comparison
Gables Park Tower is older than 45% and larger than 62% of Coral Gables's 53 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 53 Coral Gables condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Gables Laroc | 30 | 1988 | On file | 0.11 mi |
| 515 Valencia | 39 | 2022 | On file | 0.21 mi |
| Giralda Place | 33 | 2018 | On file | 0.31 mi |
| New French Village | 25 | 1991 | On file | 0.31 mi |
| Biltmore | 232 | 1973 | On file | 0.32 mi |
| Andalusia Residences | 103 | 2005 | none found | 0.33 mi |
| Gables Plaza | 91 | 1969 | none found | 0.35 mi |
Nearby condos
All Coral Gables condo communities · Miami-Dade County condo communities
FAQ
Does Gables Park Tower in Coral Gables need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 15 floors.
Has Gables Park Tower filed its SIRS?
DBPR lists a Gables Park Tower study completed December 19, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator