HomeCompareBest ways to check a Florida condo's SIRS and milestone inspection status

Best ways to check a Florida condo's SIRS and milestone inspection status

For the filing itself, use DBPR's SIRS database; for the widest list of buildings, CondoDossier; for one free page that pairs the filing with a probable first-inspection year, Condo Due Date, if the building has 25 or more units.

Checked October 2026 · facts read October 6, 2026 from each site's own pages

How we judged

These are the places the AI answers and search results we checked on October 6, 2026 send people to when they ask whether a Florida condo has filed its structural integrity reserve study or when its milestone inspection is due. We chose the criteria below before comparing, and every fact about another site is linked on its own page.

  1. It reads the state's SIRS filing records, not only the rules.
  2. It answers for one building, by name or address.
  3. It states a probable milestone inspection year, with its rule.
  4. It is free, or says exactly what it charges.
  5. It shows when its data was read.

The options

OptionPriceReads SIRS filingsMilestone yearCoverage
DBPR SIRS Reporting DatabaseFreeYes, it is the sourceNo; rules pages onlyAll submissions, two lists
CondoDossierFree pages; $35 dossierYes, matched by nameGeneric 30-year sentence27,968 registered condominiums
Condo DocketFreeYes, exact-name matchesKept separate, labeledMiami-Dade live, expanding
Condo Due DateFreeYes, with completion dateProbable year with the statute12,880 communities of 25+ units; 7,206 building pages live, the rest listed on city and county pages
Florida Condo Building Deadline CheckerFreeNo, rules and your answersFrom your answersAny building
BoardDeadlineCalculator free; kit $199NoFrom your answersAny building

Links go to our side-by-side page for each option, which links to its own site.

Which to use

What none of them can tell you

No site here can tell you whether an inspection was done or a study was finished unless a filing or a local list says so. A missing SIRS row can mean a building under three stories, a study under a different name, or a study not yet submitted. Ask the association, and ask the local building official about any milestone notice.

Condo Due Date is on this list. We earn nothing today and plan a flat per-request fee from engineering firms (how we get paid). Not legal or engineering advice; the local building official sets milestone notices and deadlines. All comparisons.

The other guide: Best tools for Florida condo boards to track milestone and SIRS deadlines. Alternatives: to CondoDossier, to BoardDeadline.