A structural integrity reserve study (SIRS) is on file with the state for this 394-unit community at 3701 N Country Club Dr, completed November 12, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
Habitable stories aren't on file. The county roll lists 1980 as the year built. If its CO was issued in 1979 and it has three or more habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed November 12, 2024.
Declaration year, before the 1980 year built.
Floors not on file.
First inspection would have been due.
Timeline
- 1979Declaration recorded December 1, 1979.
- 2024First milestone inspection would have been due.
- 2024SIRS completed November 12, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Flamenco Tower open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 394 in 2 buildings | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | December 1, 1979 | DBPR condo file, Oct 3, 2026 |
| Year built | 1980 | Miami-Dade property roll (1980) |
| Units per building | 394, 394 | SB 4-D report, Oct 5, 2026 |
| SIRS completed | November 12, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1P004021 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 7 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Building addresses | 3701 North Country Club Drive (394); 3731 North Country Club Drive (394) | SB 4-D report, Oct 5, 2026 |
| Unit parcels | 196 on the county roll, averaging 1,140 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 0.7 mile | Our calculation, TIGER 2024 |
| Association | Flanco Condo Assn Inc · formed December 15, 1977 · annual report 2026 | Sunbiz, Jul 1, 2026 |
Owners
Owners can ask the board for Flamenco Tower's inspection summary, if one was done, and the November 12, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
Flamenco Tower is older than 70% and larger than 93% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| El Dorado Towers | 515 | 1974 | On file | 0.01 mi |
| Mariner Village Garden 6 | 25 | 1987 | none found | 0.14 mi |
| Waterview | 394 | 1981 | On file | 0.17 mi |
| One Island Place | 227 | 1988 | On file | 0.18 mi |
| Delvista Towers | 433 | 1982 | On file | 0.19 mi |
| Hamptons West | 342 | 1984 | none found | 0.20 mi |
| Hamptons South | 250 | 2004 | On file | 0.21 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Flamenco Tower in Miami need a milestone inspection?
Only if it has three or more habitable stories, which our records don't show.
Has Flamenco Tower filed its SIRS?
DBPR lists a Flamenco Tower study completed November 12, 2024.