Florida condosMiami-Dade CountyMiamiEl Dorado Towers
El Dorado Towers, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 515-unit community at 3675 North Country Club Drive, completed November 18, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
Habitable stories aren't on file. The county roll lists 1974 as the year built. If its CO was issued in 1974 and it has three or more habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed November 18, 2024.
Year built (county roll).
Floors not on file.
First inspection would have been due.
Timeline
- 1974Declaration recorded May 1, 1974.
- 2024First milestone inspection would have been due.
- 2024SIRS completed November 18, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for El Dorado Towers open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 515 | DBPR condo file, Oct 3, 2026 |
| Declaration recorded | May 1, 1974 | DBPR condo file, Oct 3, 2026 |
| Year built | 1974 | Miami-Dade property roll (1974) |
| SIRS completed | November 18, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S015263 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 7 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 256 on the county roll, averaging 990 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 0.7 mile | Our calculation, TIGER 2024 |
| Association | Eldorado Towers Condo Assn Inc · formed April 22, 1974 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | Halpern Rodriguez, LLP | Sunbiz, Jul 1, 2026 |
Owners
Owners can ask the board for El Dorado Towers's inspection summary, if one was done, and the November 18, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
El Dorado Towers is older than 78% and larger than 97% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Flamenco Tower | 394 | 1979 | On file | 0.01 mi |
| Mariner Village Garden 6 | 25 | 1987 | none found | 0.14 mi |
| Waterview | 394 | 1981 | On file | 0.18 mi |
| One Island Place | 227 | 1988 | On file | 0.18 mi |
| Delvista Towers | 433 | 1982 | On file | 0.19 mi |
| Hamptons West | 342 | 1984 | none found | 0.21 mi |
| Hamptons South | 250 | 2004 | On file | 0.22 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does El Dorado Towers in Miami need a milestone inspection?
Only if it has three or more habitable stories, which our records don't show.
Has El Dorado Towers filed its SIRS?
DBPR lists a El Dorado Towers study completed November 18, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator