Florida condosMiami-Dade CountyMiamiWinston Towers
Winston Towers, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 419-unit community at 301-174TH Street, completed October 9, 2024 by an architect (DBPR's SIRS database, as of October 5, 2026).
The association reports 23 floors and a 1976 construction year. If its certificate of occupancy (CO) was issued in 1976, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed October 9, 2024.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1976Declaration recorded September 2, 1976.
- 2024First milestone inspection would have been due.
- 2024SIRS completed October 9, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Winston Towers open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 419 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | September 2, 1976 | DBPR condo file, Oct 3, 2026 |
| Year built | 1976 | association's SIRS filing (1976) |
| Floors | 23 | SIRS filing, self-reported |
| SIRS completed | October 9, 2024, by an architect | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S004907 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 7 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Distance to the coastline | about 0.5 mile | Our calculation, TIGER 2024 |
Owners
Owners can ask the board for Winston Towers's inspection summary, if one was done, and the October 9, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
Winston Towers is older than 75% and larger than 94% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Winston Towers | 391 | 1980 | none found | 0.01 mi |
| Winston Towers | 409 | 1971 | On file | 0.10 mi |
| Winston Towers | 408 | 1970 | On file | 0.10 mi |
| Fairview House | 108 | 1980 | On file | 0.15 mi |
| Winston Towers | 419 | 1974 | none found | 0.17 mi |
| Porto Bellagio | 500 | 2003 | On file | 0.21 mi |
| Salem House | 104 | 1969 | none found | 0.22 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Winston Towers in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 23 floors.
Has Winston Towers filed its SIRS?
DBPR lists a Winston Towers study completed October 9, 2024.