Washington Center, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 28-unit community at 524 Washington Avenue, completed December 20, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
The association reports 3 floors and a 1967 construction year. If its certificate of occupancy (CO) was issued in 1967 and all 3 floors are habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed December 20, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1977Declaration recorded October 24, 1977.
- 2024First milestone inspection would have been due.
- 2024SIRS completed December 20, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Washington Center open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 28 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | October 24, 1977 | DBPR condo file, Oct 3, 2026 |
| Year built | 1967 | Miami-Dade property roll (1967); association's SIRS filing (1967) |
| Floors | 3 | SIRS filing, self-reported |
| SIRS completed | December 20, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1X016498 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 8 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 28 on the county roll, averaging 460 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 0.3 mile | Our calculation, TIGER 2024 |
| Association | Washington Center Condo, Inc. · formed July 7, 1967 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Mailing address matches | the office of CAM Management Services Corp, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Washington Center's inspection summary, if one was done, and the December 20, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
Washington Center is older than 95% and larger than 2% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Aviator | 44 | 1930 | none found | 0.05 mi |
| Southern Star | 30 | 1965 | none found | 0.09 mi |
| Arcadia House | 37 | 1961 | On file | 0.11 mi |
| Villas at South Beach | 30 | 1996 | none found | 0.11 mi |
| Star Meridian | 28 | 1969 | none found | 0.12 mi |
| Barbizon Beach Club | 43 | 1937 | On file | 0.14 mi |
| Royal Atlantic | 238 | 1968 | none found | 0.14 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Washington Center in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 3 floors.
Has Washington Center filed its SIRS?
DBPR lists a Washington Center study completed December 20, 2024.