Florida condosMiami-Dade CountyMiamiNew Wave
New Wave, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 78-unit community at 725 NE 22 Street, completed August 13, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 20 floors and a 2006 construction year. If its certificate of occupancy (CO) was issued in 2006, its first milestone inspection is probably due by December 31, 2036 (s. 553.899(3)(a), F.S.).
SIRS completed August 13, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2006Declaration recorded April 3, 2006.
- 2024SIRS completed August 13, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2036First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for New Wave open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 78 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | April 3, 2006 | DBPR condo file, Oct 3, 2026 |
| Year built | 2006 | Miami-Dade property roll (2006); association's SIRS filing (2006) |
| Floors | 20 | SIRS filing, self-reported |
| SIRS completed | August 13, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR69635 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 10 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 76 on the county roll, averaging 1,080 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 3.5 miles | Our calculation, TIGER 2024 |
| Association | New Wave Condo Assn, Inc · formed March 10, 2006 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | Skrld, Inc. | Sunbiz, Jul 1, 2026 |
Owners
Owners can ask the board for New Wave's August 13, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Miami comparison
New Wave is older than 17% and larger than 43% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Elysee | 98 | 2020 | On file | 0.06 mi |
| 23 Biscayne Bay | 96 | 2012 | On file | 0.09 mi |
| Paramount Bay | 346 | 2010 | On file | 0.12 mi |
| Edgewater Lofts | 69 | 2008 | On file | 0.13 mi |
| Aria Reserve South | 383 | 2025 | none found | 0.14 mi |
| La Piazza Navona | 40 | 1976 | On file | 0.14 mi |
| Star Lofts on the Bay | 47 | 2007 | none found | 0.18 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does New Wave in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 20 floors.
Has New Wave filed its SIRS?
DBPR lists a New Wave study completed August 13, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator