Florida condosMiami-Dade CountyMiamiLa Piazza Navona
La Piazza Navona, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 40-unit community at 677 NE 24 St, completed November 6, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 7 floors and a 1976 construction year. If its certificate of occupancy (CO) was issued in 1976, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed November 6, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 2004Declaration recorded February 11, 2004.
- 2024First milestone inspection would have been due.
- 2024SIRS completed November 6, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for La Piazza Navona open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 40 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | February 11, 2004 | DBPR condo file, Oct 3, 2026 |
| Year built | 1976 | Miami-Dade property roll (1976); association's SIRS filing (1976) |
| Floors | 7 | SIRS filing, self-reported |
| SIRS completed | November 6, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR69520 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 10 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 40 on the county roll, averaging 800 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 3.5 miles | Our calculation, TIGER 2024 |
| Association | La Piazza Navona Condo Assn Inc · formed September 14, 2004 · annual report 2025 | Sunbiz, Jul 1, 2026 |
| Registered agent | CDMP Property Management Services | Sunbiz, Jul 1, 2026 |
| Mailing address matches | the office of Cd Managed Property LLC, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for La Piazza Navona's inspection summary, if one was done, and the November 6, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
La Piazza Navona is older than 75% and larger than 16% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Aria Reserve South | 383 | 2025 | none found | 0.01 mi |
| Star Lofts on the Bay | 47 | 2007 | none found | 0.04 mi |
| Onyx on the Bay | 158 | 2007 | On file | 0.05 mi |
| Riviera Towers | 38 | 1974 | On file | 0.06 mi |
| Elysee | 98 | 2020 | On file | 0.08 mi |
| 23 Biscayne Bay | 96 | 2012 | On file | 0.08 mi |
| Baylofts | 58 | 2002 | On file | 0.13 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does La Piazza Navona in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 7 floors.
Has La Piazza Navona filed its SIRS?
DBPR lists a La Piazza Navona study completed November 6, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator