Florida condosMiami-Dade CountyMiamiLa Piazza Navona

La Piazza Navona, Miami

677 NE 24 St, Miami, FL 33137 · Miami-Dade County

A structural integrity reserve study (SIRS) is on file with the state for this 40-unit community at 677 NE 24 St, completed November 6, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).

The association reports 7 floors and a 1976 construction year. If its certificate of occupancy (CO) was issued in 1976, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.

Yes

SIRS completed November 6, 2024.

1976

Year built (county roll).

7

Floors (SIRS filing).

2024

First inspection would have been due.

Timeline

Need the next inspection or study priced?

Quote requests for La Piazza Navona open once firms serving Miami-Dade County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units40 in one buildingDBPR condo file, Oct 3, 2026; building report
Declaration recordedFebruary 11, 2004DBPR condo file, Oct 3, 2026
Year built1976Miami-Dade property roll (1976); association's SIRS filing (1976)
Floors7SIRS filing, self-reported
SIRS completedNovember 6, 2024, by an engineerDBPR SIRS database, Oct 5, 2026
DBPR project numberPR69520DBPR condo file, Oct 3, 2026
FEMA flood zoneAE, base flood elevation 10 ft (high risk, special flood hazard area)FEMA flood layer, Oct 5, 2026
Unit parcels40 on the county roll, averaging 800 sq ft of living areaMiami-Dade property roll 2026
Distance to the coastlineabout 3.5 milesOur calculation, TIGER 2024
AssociationLa Piazza Navona Condo Assn Inc · formed September 14, 2004 · annual report 2025Sunbiz, Jul 1, 2026
Registered agentCDMP Property Management ServicesSunbiz, Jul 1, 2026
Mailing address matchesthe office of Cd Managed Property LLC, a licensed manager firmDBPR CAM file, Sep 30, 2026; address match only

Owners

Owners can ask the board for La Piazza Navona's inspection summary, if one was done, and the November 6, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).

Miami comparison

La Piazza Navona is older than 75% and larger than 16% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 980 Miami condo communities with 25 or more units

Within half a mile

BuildingUnitsBuilt or declaredSIRS at DBPRDistance
Aria Reserve South3832025none found0.01 mi
Star Lofts on the Bay472007none found0.04 mi
Onyx on the Bay1582007On file0.05 mi
Riviera Towers381974On file0.06 mi
Elysee982020On file0.08 mi
23 Biscayne Bay962012On file0.08 mi
Baylofts582002On file0.13 mi

Nearby condos

All Miami condo communities · Miami-Dade County condo communities

FAQ

Does La Piazza Navona in Miami need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 7 floors.

Has La Piazza Navona filed its SIRS?

DBPR lists a La Piazza Navona study completed November 6, 2024.

Corrections: condoduedate@agentmail.to · Deadline calculator