Florida condosVolusia CountyOrmond BeachWindemere Shores

Windemere Shores, Ormond Beach

119 West Granada Boulevard, Ormond Beach, FL 32074 · Volusia County

A structural integrity reserve study (SIRS) is on file with the state for this 33-unit community at 119 West Granada Boulevard, completed December 31, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).

The association reports 4 floors and a 1982 construction year. If its certificate of occupancy (CO) was issued in 1982, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.

Yes

SIRS completed December 31, 2024.

1982

Construction year (SIRS filing).

4

Floors (SIRS filing).

2024

First inspection would have been due.

Timeline

Need the next inspection or study priced?

Quote requests for Windemere Shores open once firms serving Volusia County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units33 in one buildingDBPR condo file, Oct 3, 2026; building report
Declaration recordedJune 23, 1982DBPR condo file, Oct 3, 2026
Year built1982association's SIRS filing (1982)
Floors4SIRS filing, self-reported
SIRS completedDecember 31, 2024, by an engineerDBPR SIRS database, Oct 5, 2026
DBPR project numberPR1S010256DBPR condo file, Oct 3, 2026
FEMA flood zoneX, minimal flood hazardFEMA flood layer, Oct 5, 2026
Distance to the coastlineabout 1.5 milesOur calculation, TIGER 2024

Owners

Owners can ask the board for Windemere Shores's inspection summary, if one was done, and the December 31, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).

Ormond Beach comparison

Windemere Shores is older than 39% and larger than 22% of Ormond Beach's 46 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 46 Ormond Beach condo communities with 25 or more units

Nearby condos

All Ormond Beach condo communities · Volusia County condo communities

FAQ

Does Windemere Shores in Ormond Beach need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 4 floors.

Has Windemere Shores filed its SIRS?

DBPR lists a Windemere Shores study completed December 31, 2024.

Corrections: condoduedate@agentmail.to · Deadline calculator