Florida condosMiami-Dade CountyMiamiNeo

Neo, Miami

10 SW South River Drive, Miami, FL 33150 · Miami-Dade County

A structural integrity reserve study (SIRS) is on file with the state for this 199-unit community at 10 SW South River Drive, completed December 9, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).

The association reports 21 floors and a 2004 construction year. The 2003 declaration predates the 2004 year built; with a CO in 2004 the date would be December 31, 2034. If its certificate of occupancy (CO) was issued in 2003, its first milestone inspection is probably due by December 31, 2033 (s. 553.899(3)(a), F.S.).

Yes

SIRS completed December 9, 2024.

2003

Declaration year, before the 2004 year built.

21

Floors (SIRS filing).

2033

First inspection is probably due.

Timeline

Need the next inspection or study priced?

Quote requests for Neo open once firms serving Miami-Dade County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units199 in one buildingDBPR condo file, Oct 3, 2026; building report
Declaration recordedDecember 26, 2003DBPR condo file, Oct 3, 2026
Year built2004Miami-Dade property roll (2004); association's SIRS filing (2004)
Floors21SIRS filing, self-reported
SIRS completedDecember 9, 2024, by a reserve specialistDBPR SIRS database, Oct 5, 2026
DBPR project numberPR1S026219DBPR condo file, Oct 3, 2026
FEMA flood zoneAE, base flood elevation 9 ft (high risk, special flood hazard area)FEMA flood layer, Oct 5, 2026
Unit parcels199 on the county roll, averaging 920 sq ft of living areaMiami-Dade property roll 2026
Distance to the coastlineabout 2 milesOur calculation, TIGER 2024
AssociationNeo Lofts Condo Assn Inc · formed November 24, 2003 · annual report 2026Sunbiz, Jul 1, 2026
Registered agentSKRLD, Inc.Sunbiz, Jul 1, 2026

Owners

Owners can ask the board for Neo's December 9, 2024 SIRS (s. 718.112(2)(g)11., F.S.).

Miami comparison

Neo is older than 27% and larger than 75% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 980 Miami condo communities with 25 or more units

Within half a mile

BuildingUnitsBuilt or declaredSIRS at DBPRDistance
Rio Plaza571988none found0.08 mi
Rio Plaza South571988none found0.12 mi
Rio Cristal321974none found0.12 mi
Riverside Gardens A Townhouse252000none found0.14 mi
Havana Lofts902007On file0.16 mi
Citadel602004On file0.17 mi
Rio302007none found0.36 mi

Nearby condos

All Miami condo communities · Miami-Dade County condo communities

FAQ

Does Neo in Miami need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 21 floors.

Has Neo filed its SIRS?

DBPR lists a Neo study completed December 9, 2024.

Corrections: condoduedate@agentmail.to · Deadline calculator