Florida condosMiami-Dade CountyMiamiAragon Plaza
Aragon Plaza, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 45-unit community at 1010 N.w. 11 Street, completed March 22, 2025 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 6 floors and a 1997 construction year. If its certificate of occupancy (CO) was issued in 1997, its first milestone inspection is probably due by December 31, 2027 (s. 553.899(3)(a), F.S.). A local building department can require the first inspection at 25 years: check with City of Miami Building Department.
SIRS completed March 22, 2025.
Year built (county roll).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2002Declaration recorded December 31, 2002.
- 2025SIRS completed March 22, 2025; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2027First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Aragon Plaza open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 45 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | December 31, 2002 | DBPR condo file, Oct 3, 2026 |
| Year built | 1997 | Miami-Dade property roll (1997); association's SIRS filing (1997) |
| Floors | 6 | SIRS filing, self-reported |
| SIRS completed | March 22, 2025, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S024075 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 9 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 45 on the county roll, averaging 920 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 2.5 miles | Our calculation, TIGER 2024 |
Owners
Owners can ask the board for Aragon Plaza's March 22, 2025 SIRS (s. 718.112(2)(g)11., F.S.).
Miami comparison
Aragon Plaza is older than 36% and larger than 21% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Seybold Pointe | 96 | 2004 | On file | 0.08 mi |
| Highland Park Lofts | 48 | 2007 | none found | 0.26 mi |
| Jubilee Villas | 30 | 2003 | none found | 0.28 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Aragon Plaza in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 6 floors.
Has Aragon Plaza filed its SIRS?
DBPR lists a Aragon Plaza study completed March 22, 2025.
Corrections: condoduedate@agentmail.to · Deadline calculator