Florida condosMiami-Dade CountyAventuraAtlantic I at the Point

Atlantic I at the Point, Aventura

21200 Point Place, Aventura, FL 33180 · Miami-Dade County

A structural integrity reserve study (SIRS) is on file with the state for this 137-unit community at 21200 Point Place, completed November 22, 2023 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).

The association reports 31 floors. The county roll lists 2004 as the year built. If its certificate of occupancy (CO) was issued in 2004, its first milestone inspection is probably due by December 31, 2034 (s. 553.899(3)(a), F.S.).

Yes

SIRS completed November 22, 2023.

2004

Year built (county roll).

31

Floors (SIRS filing).

2034

First inspection is probably due.

Timeline

Need the next inspection or study priced?

Quote requests for Atlantic I at the Point open once firms serving Miami-Dade County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units137 in one buildingDBPR condo file, Oct 3, 2026; building report
Declaration recordedApril 16, 2004DBPR condo file, Oct 3, 2026
Year built2004Miami-Dade property roll (2004)
Floors31SIRS filing, self-reported
SIRS completedNovember 22, 2023, by a reserve specialistDBPR SIRS database, Oct 5, 2026
DBPR project numberPR1G025829DBPR condo file, Oct 3, 2026
Unit parcels137 on the county roll, averaging 3,230 sq ft of living areaMiami-Dade property roll 2026

Owners

Owners can ask the board for Atlantic I at the Point's November 22, 2023 SIRS (s. 718.112(2)(g)11., F.S.).

Aventura comparison

Atlantic I at the Point is older than 42% and larger than 28% of Aventura's 43 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 43 Aventura condo communities with 25 or more units

Nearby condos

All Aventura condo communities · Miami-Dade County condo communities

FAQ

Does Atlantic I at the Point in Aventura need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 31 floors.

Has Atlantic I at the Point filed its SIRS?

DBPR lists a Atlantic I at the Point study completed November 22, 2023.

Corrections: condoduedate@agentmail.to · Deadline calculator