Lighthouse Point, Sanibel
A structural integrity reserve study (SIRS) is on file with the state for this 69-unit community at 1250 Lighthouse Way, completed November 1, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
The association reports 3 floors and a 1976 construction year. If its certificate of occupancy (CO) was issued in 1976 and all 3 floors are habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed November 1, 2024.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1976Declaration recorded March 18, 1976.
- 2024First milestone inspection would have been due.
- 2024SIRS completed November 1, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Lighthouse Point open once firms serving Lee County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 69 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | March 18, 1976 | DBPR condo file, Oct 3, 2026 |
| Year built | 1976 | association's SIRS filing (1976) |
| Floors | 3 | SIRS filing, self-reported |
| SIRS completed | November 1, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S011593 | DBPR condo file, Oct 3, 2026 |
| Mailing address matches | the office of Hawk-Eye Management, LLC, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Lighthouse Point's inspection summary, if one was done, and the November 1, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Sanibel comparison
Lighthouse Point is older than 30% and larger than 67% of Sanibel's 30 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
Nearby condos
All Sanibel condo communities · Lee County condo communities
FAQ
Does Lighthouse Point in Sanibel need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 3 floors.
Has Lighthouse Point filed its SIRS?
DBPR lists a Lighthouse Point study completed November 1, 2024.