Florida condosMiami-Dade CountyMiamiCaptiva Lakes Villas
Captiva Lakes Villas, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 230-unit community at 8301 S.w. 142nd Avenue, completed November 19, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 3 floors and a 1972 construction year. If its certificate of occupancy (CO) was issued in 1972 and all 3 floors are habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed November 19, 2024.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 2001Declaration recorded March 27, 2001.
- 2024First milestone inspection would have been due.
- 2024SIRS completed November 19, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Captiva Lakes Villas open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 230 | DBPR condo file, Oct 3, 2026 |
| Declaration recorded | March 27, 2001 | DBPR condo file, Oct 3, 2026 |
| Year built | 1972 | association's SIRS filing (1972) |
| Floors | 3 | SIRS filing, self-reported |
| SIRS completed | November 19, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1V025806 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AH, base flood elevation 8 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Distance to the coastline | about 9 miles | Our calculation, TIGER 2024 |
| Association | Captiva Lakes Villas Condo Assn Inc · formed March 22, 2001 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | Ar Law Group PLLC | Sunbiz, Jul 1, 2026 |
| Mailing address matches | the office of Miami Management Inc, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Captiva Lakes Villas's inspection summary, if one was done, and the November 19, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
Captiva Lakes Villas is older than 86% and larger than 79% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Lake Laura | 103 | 1972 | none found | 0.31 mi |
| Taracomo Townhomes | 120 | 1974 | none found | 0.39 mi |
| Kendall Heights | 100 | 1976 | none found | 0.42 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Captiva Lakes Villas in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 3 floors.
Has Captiva Lakes Villas filed its SIRS?
DBPR lists a Captiva Lakes Villas study completed November 19, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator