Florida condosMiami-Dade CountyMiamiThree Tequesta Point
Three Tequesta Point, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 236-unit community at Brickell Key Drive, completed August 9, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
The association reports 46 floors and a 2001 construction year. If its certificate of occupancy (CO) was issued in 2001, its first milestone inspection is probably due by December 31, 2031 (s. 553.899(3)(a), F.S.). A local building department can require the first inspection at 25 years: check with City of Miami Building Department.
SIRS completed August 9, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2001Declaration recorded August 8, 2001.
- 2024SIRS completed August 9, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2031First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Three Tequesta Point open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 236 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | August 8, 2001 | DBPR condo file, Oct 3, 2026 |
| Year built | 2001 | Miami-Dade property roll (2001); association's SIRS filing (2001) |
| Floors | 46 | SIRS filing, self-reported |
| SIRS completed | August 9, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1U025249 | DBPR condo file, Oct 3, 2026 |
| Unit parcels | 236 on the county roll, averaging 1,910 sq ft of living area | Miami-Dade property roll 2026 |
Owners
Owners can ask the board for Three Tequesta Point's August 9, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Miami comparison
Three Tequesta Point is older than 30% and larger than 80% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Three Tequesta Point in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 46 floors.
Has Three Tequesta Point filed its SIRS?
DBPR lists a Three Tequesta Point study completed August 9, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator