Florida condosMiami-Dade CountyMiamiParkway Towers
Parkway Towers, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 151-unit community at 15600 NW 7th Ave, completed December 30, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 8 floors and a 1972 construction year. If its certificate of occupancy (CO) was issued in 1972, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed December 30, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1972Declaration recorded November 10, 1972.
- 2024First milestone inspection would have been due.
- 2024SIRS completed December 30, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Parkway Towers open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 151 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | November 10, 1972 | DBPR condo file, Oct 3, 2026 |
| Year built | 1972 | Miami-Dade property roll (1972); association's SIRS filing (1972) |
| Floors | 8 | SIRS filing, self-reported |
| SIRS completed | December 30, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S017717 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 7 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 150 on the county roll, averaging 890 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 5.5 miles | Our calculation, TIGER 2024 |
| Mailing address matches | the office of Infinity Community Management Inc, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Parkway Towers's inspection summary, if one was done, and the December 30, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
Parkway Towers is older than 86% and larger than 66% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Parkway Towers in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 8 floors.
Has Parkway Towers filed its SIRS?
DBPR lists a Parkway Towers study completed December 30, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator