Florida condosBay CountyPanama CityAt Waterside Village
At Waterside Village, Panama City
A structural integrity reserve study (SIRS) is on file with the state for this 51-unit community at Po Box 2422, completed December 16, 2024 by an engineer (DBPR's SIRS database, as of November 9, 2026).
The association reports 4 floors and a 2007 construction year. If its certificate of occupancy (CO) was issued in 2007, its first milestone inspection is probably due by December 31, 2037 (s. 553.899(3)(a), F.S.).
SIRS completed December 16, 2024.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2007Declaration recorded May 25, 2007.
- 2024SIRS completed December 16, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2037First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for At Waterside Village open once firms serving Bay County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 51 in 2 buildings | DBPR condo file, Oct 31, 2026; building report |
| Declaration recorded | May 25, 2007 | DBPR condo file, Oct 31, 2026 |
| Year built | 2007 | association's SIRS filing (2007) |
| Floors | 4 | SIRS filing, self-reported |
| Units per building | 42, 42 | SB 4-D report, Nov 9, 2026 |
| SIRS completed | December 16, 2024, by an engineer | DBPR SIRS database, Nov 9, 2026 |
| DBPR project number | PR70937 | DBPR condo file, Oct 31, 2026 |
| Building addresses | 101 Natures Way (42); 102 Natures Way (42) | SB 4-D report, Nov 9, 2026 |
Owners
Owners can ask the board for At Waterside Village's December 16, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Panama City comparison
At Waterside Village is older than 4% and larger than 35% of Panama City's 26 communities with 25+ units (our calculation from the DBPR condo file, Oct 31, 2026).
Nearby condos
All Panama City condo communities · Bay County condo communities
FAQ
Does At Waterside Village in Panama City need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 4 floors.
Has At Waterside Village filed its SIRS?
DBPR lists a At Waterside Village study completed December 16, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator