Horizon South, Panama City
We found no structural integrity reserve study for this 76-unit community at 17462 W Highway 98 A in DBPR's database (checked November 9, 2026). That does not mean none was done: DBPR shows only complete submissions, and our match is by name and address.
Habitable stories aren't on file. No year built is on file, so we use the declaration year, 1979. If its CO was issued in 1979 and it has three or more habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS in DBPR's database, checked November 9, 2026.
Declaration year; no year built.
Floors not on file.
First inspection would have been due.
Timeline
- 1979Declaration recorded November 28, 1979.
- 2024First milestone inspection would have been due.
- 2025SIRS deadline (s. 718.112(2)(g)7., F.S.).
Need the next inspection or study priced?
Quote requests for Horizon South open once firms serving Bay County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 76 in one building | DBPR condo file, Oct 31, 2026; building report |
| Declaration recorded | November 28, 1979 | DBPR condo file, Oct 31, 2026 |
| SIRS at DBPR | None found (checked November 9, 2026) | DBPR SIRS database; name and address match |
| DBPR project number | PR1S011454 | DBPR condo file, Oct 31, 2026 |
| Association | Horizon South Condo Assn · formed October 22, 1979 · annual report 2026 | Sunbiz, Oct 7, 2026 |
| Registered agent | 4our SeaSuns, LLC | Sunbiz, Oct 7, 2026 |
Owners
Owners can ask the board for Horizon South's inspection summary, if one was done, and the SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Panama City comparison
Horizon South is older than 58% and larger than 58% of Panama City's 26 communities with 25+ units (our calculation from the DBPR condo file, Oct 31, 2026).
Nearby condos
All Panama City condo communities · Bay County condo communities
FAQ
Does Horizon South in Panama City need a milestone inspection?
Only if it has three or more habitable stories, which our records don't show.
Has Horizon South filed its SIRS?
We found none for Horizon South in DBPR's database, which isn't proof none was done.