Florida condosBay CountyPanama CityLatitude
Latitude, Panama City
A structural integrity reserve study (SIRS) is on file with the state for this 36-unit community at 21703 W Highway 98, completed December 31, 2024 by an engineer (DBPR's SIRS database, as of November 9, 2026).
The association reports 3 floors and a 1979 construction year. If its certificate of occupancy (CO) was issued in 1976 and all 3 floors are habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed December 31, 2024.
Declaration year, before the 1979 year built.
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1976Declaration recorded December 30, 1976.
- 2024First milestone inspection would have been due.
- 2024SIRS completed December 31, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Latitude open once firms serving Bay County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 36 in one building | DBPR condo file, Oct 31, 2026; building report |
| Declaration recorded | December 30, 1976 | DBPR condo file, Oct 31, 2026 |
| Year built | 1979 | association's SIRS filing (1979) |
| Floors | 3 | SIRS filing, self-reported |
| SIRS completed | December 31, 2024, by an engineer | DBPR SIRS database, Nov 9, 2026 |
| DBPR project number | PR1S007252 | DBPR condo file, Oct 31, 2026 |
Owners
Owners can ask the board for Latitude's inspection summary, if one was done, and the December 31, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Panama City comparison
Latitude is older than 65% and larger than 15% of Panama City's 26 communities with 25+ units (our calculation from the DBPR condo file, Oct 31, 2026).
Nearby condos
All Panama City condo communities · Bay County condo communities
FAQ
Does Latitude in Panama City need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 3 floors.
Has Latitude filed its SIRS?
DBPR lists a Latitude study completed December 31, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator