Florida condosMiami-Dade CountyMiamiLoft Downtown
Loft Downtown, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 196-unit community at 234 NE 3rd St, completed October 24, 2024 by an engineer (DBPR's SIRS database, as of November 9, 2026).
The association reports 23 floors and a 2005 construction year. If its certificate of occupancy (CO) was issued in 2005, its first milestone inspection is probably due by December 31, 2035 (s. 553.899(3)(a), F.S.).
SIRS completed October 24, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2005Declaration recorded November 23, 2005.
- 2024SIRS completed October 24, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2035First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Loft Downtown open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 196 in one building | DBPR condo file, Oct 31, 2026; building report |
| Declaration recorded | November 23, 2005 | DBPR condo file, Oct 31, 2026 |
| Year built | 2005 | Miami-Dade property roll (2005); association's SIRS filing (2005) |
| Floors | 23 | SIRS filing, self-reported |
| SIRS completed | October 24, 2024, by an engineer | DBPR SIRS database, Nov 9, 2026 |
| DBPR project number | PR69335 | DBPR condo file, Oct 31, 2026 |
| FEMA flood zone | X, minimal flood hazard | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 193 on the county roll, averaging 840 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 2 miles | Our calculation, TIGER 2024 |
| Association | Loft Downtown Condo Assn Inc · formed June 30, 2005 · annual report 2026 | Sunbiz, Oct 7, 2026 |
| Registered agent | Tryson Law Offices, PLLC | Sunbiz, Oct 7, 2026 |
| Mailing address matches | the office of Kw Property Management & Consulting, a licensed manager firm | DBPR CAM file, Oct 28, 2026; address match only |
Owners
Owners can ask the board for Loft Downtown's October 24, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Miami comparison
Loft Downtown is older than 21% and larger than 74% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 31, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Vizcayne South | 440 | 2008 | On file | 0.06 mi |
| 227 Ne 2ND Street | 232 | 2021 | none found | 0.06 mi |
| Vizcayne | 409 | 2008 | On file | 0.06 mi |
| Loft Downtown | 496 | 2007 | none found | 0.13 mi |
| 398 Ne 5TH Street | 40 | 2022 | none found | 0.14 mi |
| 50 Biscayne | 534 | 2007 | On file | 0.19 mi |
| 501 First Residences | 476 | 2025 | none found | 0.22 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Loft Downtown in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 23 floors.
Has Loft Downtown filed its SIRS?
DBPR lists a Loft Downtown study completed October 24, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator