Florida condosMiami-Dade CountyMiamiAragon Towers
Aragon Towers, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 98-unit community at 5249 NW 7th St, completed December 5, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 5 floors and a 1991 construction year. The county roll lists 1985 as the year built. If its certificate of occupancy (CO) was issued in 1985, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed December 5, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1985Declaration recorded December 11, 1985.
- 2024First milestone inspection would have been due.
- 2024SIRS completed December 5, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Aragon Towers open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 98 | DBPR condo file, Oct 3, 2026 |
| Declaration recorded | December 11, 1985 | DBPR condo file, Oct 3, 2026 |
| Year built | 1985 and 1991 (the two sources differ; we use the earlier) | Miami-Dade property roll (1985); association's SIRS filing (1991) |
| Floors | 5 | SIRS filing, self-reported |
| SIRS completed | December 5, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S014684 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AH, base flood elevation 7 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 98 on the county roll, averaging 920 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 4.5 miles | Our calculation, TIGER 2024 |
| Mailing address matches | the office of Professional Management & Association Services Inc,, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Aragon Towers's inspection summary, if one was done, and the December 5, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
Aragon Towers is older than 52% and larger than 53% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| El Lago | 144 | 1972 | On file | 0.18 mi |
| 5050 | 138 | 1973 | none found | 0.22 mi |
| Blue Lagoon | 608 | 2003 | On file | 0.23 mi |
| Half Moon Tower | 141 | 1973 | none found | 0.25 mi |
| Moon Tower | 72 | 1973 | On file | 0.27 mi |
| Vista Lake | 50 | 2000 | none found | 0.37 mi |
| Diamond | 32 | 1997 | none found | 0.39 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Aragon Towers in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 5 floors.
Has Aragon Towers filed its SIRS?
DBPR lists a Aragon Towers study completed December 5, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator