Florida condosBroward CountyHallandaleThird Gulfstream Garden
Third Gulfstream Garden, Hallandale
We found no structural integrity reserve study for this 96-unit community at 330 SW 2nd Street in DBPR's database (checked October 5, 2026). That does not mean none was done: DBPR shows only complete submissions, and our match is by name and address.
Habitable stories aren't on file. No year built is on file, so we use the declaration year, 1969. If its CO was issued in 1969 and it has three or more habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official. City of Hallandale Beach Building Division applies a 25-year clock inside its limits (its page).
SIRS in DBPR's database, checked October 5, 2026.
Declaration year; no year built.
Floors not on file.
First inspection would have been due.
Timeline
- 1969Declaration recorded December 1, 1969.
- 2024First milestone inspection would have been due.
- 2025SIRS deadline (s. 718.112(2)(g)7., F.S.).
Need the next inspection or study priced?
Quote requests for Third Gulfstream Garden open once firms serving Broward County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 96 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | December 1, 1969 | DBPR condo file, Oct 3, 2026 |
| SIRS at DBPR | None found (checked October 5, 2026) | DBPR SIRS database; name and address match |
| DBPR project number | PR1S019257 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | X, moderate flood hazard (0.2% annual chance) | FEMA flood layer, Oct 5, 2026 |
| Distance to the coastline | about 2 miles | Our calculation, TIGER 2024 |
Owners
Owners can ask the board for Third Gulfstream Garden's inspection summary, if one was done, and the SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Hallandale comparison
Third Gulfstream Garden is older than 64% and larger than 63% of Hallandale's 106 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 106 Hallandale condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Sevilla Palace at Hallandale Beach | 38 | 1970 | none found | 0.25 mi |
| Highland Park Village | 53 | 2010 | none found | 0.28 mi |
| First Gulfstream Garden | 128 | 1968 | none found | 0.39 mi |
| Gulfstream Garden | 88 | 1969 | none found | 0.47 mi |
| Fourth Gulfstream Gardens | 96 | 1973 | none found | 0.48 mi |
| Crystal | 34 | 1973 | none found | 0.48 mi |
Nearby condos
All Hallandale condo communities · Broward County condo communities
FAQ
Does Third Gulfstream Garden in Hallandale need a milestone inspection?
Only if it has three or more habitable stories, which our records don't show.
Has Third Gulfstream Garden filed its SIRS?
We found none for Third Gulfstream Garden in DBPR's database, which isn't proof none was done.
Corrections: condoduedate@agentmail.to · Deadline calculator