Florida condosBroward CountyHallandaleApril Mist
April Mist, Hallandale
A structural integrity reserve study (SIRS) is on file with the state for this 59-unit community at 1333 E. Hallandale Beach Blvd., completed November 17, 2024 by an architect (DBPR's SIRS database, as of October 5, 2026).
The association reports 4 floors and a 1967 construction year. The county roll lists 1966 as the year built. If its certificate of occupancy (CO) was issued in 1966, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official. City of Hallandale Beach Building Division applies a 25-year clock inside its limits (its page).
SIRS completed November 17, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1967Declaration recorded January 1, 1967.
- 2024First milestone inspection would have been due.
- 2024SIRS completed November 17, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for April Mist open once firms serving Broward County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 59 | DBPR condo file, Oct 3, 2026 |
| Declaration recorded | January 1, 1967 | DBPR condo file, Oct 3, 2026 |
| Year built | 1966 | Broward property roll (1966); association's SIRS filing (1967) |
| Floors | 4 | SIRS filing, self-reported |
| SIRS completed | November 17, 2024, by an architect | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S015570 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 7 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 174 on the county roll, averaging 800 sq ft of living area | Broward property roll 2026 |
| Distance to the coastline | about 1 mile | Our calculation, TIGER 2024 |
Owners
Owners can ask the board for April Mist's inspection summary, if one was done, and the November 17, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Hallandale comparison
April Mist is older than 83% and larger than 40% of Hallandale's 106 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 106 Hallandale condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| April Song | 59 | 1966 | On file | 0.00 mi |
| April Breeze | 56 | 1966 | none found | 0.00 mi |
| Eldorado Plaza West | 85 | 1966 | none found | 0.16 mi |
| Eldorado Plaza East | 72 | 1966 | On file | 0.16 mi |
| L Solei at Hallandale Beach | 59 | 1969 | none found | 0.17 mi |
| Meadowbrook Towers | 40 | 1968 | On file | 0.18 mi |
| Meadowbrook Towers | 40 | 1968 | On file | 0.19 mi |
Nearby condos
All Hallandale condo communities · Broward County condo communities
FAQ
Does April Mist in Hallandale need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 4 floors.
Has April Mist filed its SIRS?
DBPR lists a April Mist study completed November 17, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator