Florida condosBrevard CountyCocoa BchCrossway
Crossway, Cocoa Bch
We found no structural integrity reserve study for this 49-unit community at Ocean Beach Blvd in DBPR's database (checked October 5, 2026). That does not mean none was done: DBPR shows only complete submissions, and our match is by name and address.
Habitable stories aren't on file. No year built is on file, so we use the declaration year, 1971. If its CO was issued in 1971 and it has three or more habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS in DBPR's database, checked October 5, 2026.
Declaration year; no year built.
Floors not on file.
First inspection would have been due.
Timeline
- 1971Declaration recorded December 13, 1971.
- 2024First milestone inspection would have been due.
- 2025SIRS deadline (s. 718.112(2)(g)7., F.S.).
Need the next inspection or study priced?
Quote requests for Crossway open once firms serving Brevard County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 49 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | December 13, 1971 | DBPR condo file, Oct 3, 2026 |
| SIRS at DBPR | None found (checked October 5, 2026) | DBPR SIRS database; name and address match |
| DBPR project number | PR1S019368 | DBPR condo file, Oct 3, 2026 |
| Association | Crossway Association Inc · formed December 6, 1971 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | BP Davis Property Management, Inc | Sunbiz, Jul 1, 2026 |
| Mailing address matches | the office of Double Eagle Realty Inc, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Crossway's inspection summary, if one was done, and the SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Cocoa Bch comparison
Cocoa Bch has 3 condo communities with 25+ units declared or built before 1997. DBPR's SIRS database lists a study for at least 2 of them (67%).
Nearby condos
FAQ
Does Crossway in Cocoa Bch need a milestone inspection?
Only if it has three or more habitable stories, which our records don't show.
Has Crossway filed its SIRS?
We found none for Crossway in DBPR's database, which isn't proof none was done.