Florida condosPinellas CountyBelleairSeaside at Belleair

Seaside at Belleair, Belleair

Seaside Lane, Belleair, FL 34616 · Pinellas County

A structural integrity reserve study (SIRS) is on file with the state for this 30-unit community at Seaside Lane, completed June 7, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).

The association reports 8 floors and a 1994 construction year. The county roll lists 1995 as the year built. If its certificate of occupancy (CO) was issued in 1994, its first milestone inspection would have been due by December 31, 2025 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.

Yes

SIRS completed June 7, 2024.

1994

Construction year (SIRS filing).

8

Floors (SIRS filing).

2025

First inspection would have been due.

Timeline

Need the next inspection or study priced?

Quote requests for Seaside at Belleair open once firms serving Pinellas County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units30 in one buildingDBPR condo file, Oct 3, 2026; building report
Declaration recordedJune 7, 1995DBPR condo file, Oct 3, 2026
Year built1994Pinellas property roll (1995); association's SIRS filing (1994)
Floors8SIRS filing, self-reported
SIRS completedJune 7, 2024, by a reserve specialistDBPR SIRS database, Oct 5, 2026
DBPR project numberPR1G022744DBPR condo file, Oct 3, 2026
Unit parcels30 on the county roll, averaging 2,390 sq ft of living areaPinellas property roll 2026

Owners

Owners can ask the board for Seaside at Belleair's inspection summary, if one was done, and the June 7, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).

Belleair comparison

Seaside at Belleair is older than 19% and larger than 6% of Belleair's 16 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 16 Belleair condo communities with 25 or more units

Nearby condos

All Belleair condo communities · Pinellas County condo communities

FAQ

Does Seaside at Belleair in Belleair need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 8 floors.

Has Seaside at Belleair filed its SIRS?

DBPR lists a Seaside at Belleair study completed June 7, 2024.

Corrections: condoduedate@agentmail.to · Deadline calculator