Florida condosPinellas CountyBelleairSeaside at Belleair
Seaside at Belleair, Belleair
A structural integrity reserve study (SIRS) is on file with the state for this 30-unit community at Seaside Lane, completed June 7, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
The association reports 8 floors and a 1994 construction year. The county roll lists 1995 as the year built. If its certificate of occupancy (CO) was issued in 1994, its first milestone inspection would have been due by December 31, 2025 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed June 7, 2024.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1995Declaration recorded June 7, 1995.
- 2024SIRS completed June 7, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2025First milestone inspection would have been due.
Need the next inspection or study priced?
Quote requests for Seaside at Belleair open once firms serving Pinellas County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 30 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | June 7, 1995 | DBPR condo file, Oct 3, 2026 |
| Year built | 1994 | Pinellas property roll (1995); association's SIRS filing (1994) |
| Floors | 8 | SIRS filing, self-reported |
| SIRS completed | June 7, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1G022744 | DBPR condo file, Oct 3, 2026 |
| Unit parcels | 30 on the county roll, averaging 2,390 sq ft of living area | Pinellas property roll 2026 |
Owners
Owners can ask the board for Seaside at Belleair's inspection summary, if one was done, and the June 7, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Belleair comparison
Seaside at Belleair is older than 19% and larger than 6% of Belleair's 16 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
Nearby condos
All Belleair condo communities · Pinellas County condo communities
FAQ
Does Seaside at Belleair in Belleair need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 8 floors.
Has Seaside at Belleair filed its SIRS?
DBPR lists a Seaside at Belleair study completed June 7, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator