A structural integrity reserve study (SIRS) is on file with the state for this 96-unit community at 3048-3050 Sunrise Dr. East, completed December 17, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 4 floors and a 1975 construction year. If its certificate of occupancy (CO) was issued in 1974, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the city building department or Broward County Building Code Services.
SIRS completed December 17, 2024.
Declaration year, before the 1975 year built.
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1974Declaration recorded August 20, 1974.
- 2024First milestone inspection would have been due.
- 2024SIRS completed December 17, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Quail Run of Sunrise open once firms serving Broward County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 96 in 2 buildings | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | August 20, 1974 | DBPR condo file, Oct 3, 2026 |
| Year built | 1975 | association's SIRS filing (1975) |
| Floors | 4 | SIRS filing, self-reported |
| Units per building | 96, 96 | SB 4-D report, Oct 5, 2026 |
| SIRS completed | December 17, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S006739 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | X, moderate flood hazard (0.2% annual chance) | FEMA flood layer, Oct 5, 2026 |
| Building addresses | 3048 Sunrise Drive East (96); 3050 Sunrise Drive East (96) | SB 4-D report, Oct 5, 2026 |
| Distance to the coastline | about 9 miles | Our calculation, TIGER 2024 |
| Mailing address matches | the office of Mlp Property Management, Inc, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Quail Run of Sunrise's inspection summary, if one was done, and the December 17, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Sunrise comparison
Quail Run of Sunrise is older than 74% and larger than 49% of Sunrise's 69 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 69 Sunrise condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Quail Run of Sunrise | 96 | 1974 | none found | 0.17 mi |
| Falls of Inverrary | 750 | 1974 | none found | 0.37 mi |
| Winding Lake 2 at Welleby | 96 | 1985 | none found | 0.37 mi |
| Winding Lake Two Welleby | 72 | 1984 | none found | 0.37 mi |
Nearby condos
All Sunrise condo communities · Broward County condo communities
FAQ
Does Quail Run of Sunrise in Sunrise need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 4 floors.
Has Quail Run of Sunrise filed its SIRS?
DBPR lists a Quail Run of Sunrise study completed December 17, 2024.