Florida condosBroward CountySunriseMetropica Tower
Metropica Tower, Sunrise
A structural integrity reserve study (SIRS) is on file with the state for this 263-unit community at 2000 Metropica Way, completed September 20, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 28 floors and a 2021 construction year. The county roll lists 2020 as the year built. If its certificate of occupancy (CO) was issued in 2020, its first milestone inspection is probably due by December 31, 2050 (s. 553.899(3)(a), F.S.).
SIRS completed September 20, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2020Declaration recorded July 7, 2020.
- 2024SIRS completed September 20, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2050First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Metropica Tower open once firms serving Broward County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 263 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | July 7, 2020 | DBPR condo file, Oct 3, 2026 |
| Year built | 2020 | Broward property roll (2020); association's SIRS filing (2021) |
| Floors | 28 | SIRS filing, self-reported |
| SIRS completed | September 20, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR76145 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | X, moderate flood hazard (0.2% annual chance) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 263 on the county roll, averaging 1,030 sq ft of living area | Broward property roll 2026 |
| Distance to the coastline | about 14 miles | Our calculation, TIGER 2024 |
| Association | Metropica North Tower One Condo Assn Inc · formed June 9, 2014 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | Haber Law Llp | Sunbiz, Jul 1, 2026 |
Owners
Owners can ask the board for Metropica Tower's September 20, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Sunrise comparison
Metropica Tower is older than 0% and larger than 78% of Sunrise's 69 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
Nearby condos
All Sunrise condo communities · Broward County condo communities
FAQ
Does Metropica Tower in Sunrise need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 28 floors.
Has Metropica Tower filed its SIRS?
DBPR lists a Metropica Tower study completed September 20, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator