Florida condosPinellas CountySt. PetersburgTierra

Tierra, St. Petersburg

Tierra Verde, St. Petersburg, FL 33715 · Pinellas County

A structural integrity reserve study (SIRS) is on file with the state for this 33-unit community at Tierra Verde, completed January 8, 2025 by an engineer (DBPR's SIRS database, as of October 5, 2026).

The association reports 3 floors and a 1986 construction year. If its certificate of occupancy (CO) was issued in 1980 and all 3 floors are habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.

Yes

SIRS completed January 8, 2025.

1980

Declaration year, before the 1986 year built.

3

Floors (SIRS filing).

2024

First inspection would have been due.

Timeline

Need the next inspection or study priced?

Quote requests for Tierra open once firms serving Pinellas County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units33 in one buildingDBPR condo file, Oct 3, 2026; building report
Declaration recordedJanuary 29, 1980DBPR condo file, Oct 3, 2026
Year built1986association's SIRS filing (1986)
Floors3SIRS filing, self-reported
SIRS completedJanuary 8, 2025, by an engineerDBPR SIRS database, Oct 5, 2026
DBPR project numberPR1S012882DBPR condo file, Oct 3, 2026

Owners

Owners can ask the board for Tierra's inspection summary, if one was done, and the January 8, 2025 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).

St. Petersburg comparison

Tierra is older than 35% and larger than 16% of St. Petersburg's 283 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 283 St. Petersburg condo communities with 25 or more units

Nearby condos

All St. Petersburg condo communities · Pinellas County condo communities

FAQ

Does Tierra in St. Petersburg need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 3 floors.

Has Tierra filed its SIRS?

DBPR lists a Tierra study completed January 8, 2025.

Corrections: condoduedate@agentmail.to · Deadline calculator