Florida condosBrevard CountySatellite BeachEastwind
Eastwind, Satellite Beach
A structural integrity reserve study (SIRS) is on file with the state for this 52-unit community at 1455 North A 1 A, completed October 3, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
The association reports 5 floors and a 1981 construction year. If its certificate of occupancy (CO) was issued in 1981, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed October 3, 2024.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1981Declaration recorded December 31, 1981.
- 2024First milestone inspection would have been due.
- 2024SIRS completed October 3, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Eastwind open once firms serving Brevard County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 52 in 2 buildings | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | December 31, 1981 | DBPR condo file, Oct 3, 2026 |
| Year built | 1981 | association's SIRS filing (1981) |
| Floors | 5 | SIRS filing, self-reported |
| Units per building | 52, 52 | SB 4-D report, Oct 5, 2026 |
| SIRS completed | October 3, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1P008300 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | X, minimal flood hazard | FEMA flood layer, Oct 5, 2026 |
| Building addresses | 1465 Highway A1A (52); 1455 Highway A1A (52) | SB 4-D report, Oct 5, 2026 |
| Distance to the coastline | about 0.1 mile | Our calculation, TIGER 2024 |
| Association | Eastwind of Satellite Beach Condo Assn, Inc · formed November 12, 1981 · annual report 2026 | Sunbiz, Jul 1, 2026 |
Owners
Owners can ask the board for Eastwind's inspection summary, if one was done, and the October 3, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Satellite Beach comparison
Eastwind is older than 38% and larger than 38% of Satellite Beach's 16 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 16 Satellite Beach condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Sand Castle | 39 | 1964 | none found | 0.46 mi |
Nearby condos
All Satellite Beach condo communities · Brevard County condo communities
FAQ
Does Eastwind in Satellite Beach need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 5 floors.
Has Eastwind filed its SIRS?
DBPR lists a Eastwind study completed October 3, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator