Florida condosPinellas CountyRedington ShoresSea Oats

Sea Oats, Redington Shores

17500 Gulf Blvd, Redington Shores, FL 33708 · Pinellas County

A structural integrity reserve study (SIRS) is on file with the state for this 41-unit community at 17500 Gulf Blvd, completed February 5, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).

The association reports 6 floors and a 1980 construction year. If its certificate of occupancy (CO) was issued in 1980, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.

Yes

SIRS completed February 5, 2024.

1980

Year built (county roll).

6

Floors (SIRS filing).

2024

First inspection would have been due.

Timeline

Need the next inspection or study priced?

Quote requests for Sea Oats open once firms serving Pinellas County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units41 in one buildingDBPR condo file, Oct 3, 2026; building report
Declaration recordedMarch 24, 1980DBPR condo file, Oct 3, 2026
Year built1980Pinellas property roll (1980); association's SIRS filing (1980)
Floors6SIRS filing, self-reported
SIRS completedFebruary 5, 2024, by an engineerDBPR SIRS database, Oct 5, 2026
DBPR project numberPR1S008714DBPR condo file, Oct 3, 2026
FEMA flood zoneAE, base flood elevation 10 ft (high risk, special flood hazard area)FEMA flood layer, Oct 5, 2026
Unit parcels39 on the county roll, averaging 1,390 sq ft of living areaPinellas property roll 2026
Distance to the coastlineabout 0.1 mileOur calculation, TIGER 2024
AssociationSea Oats Condo Assn. · formed October 23, 1978 · annual report 2026Sunbiz, Jul 1, 2026
Registered agentKeys Property Management Enterprise, Inc.Sunbiz, Jul 1, 2026

Owners

Owners can ask the board for Sea Oats's inspection summary, if one was done, and the February 5, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).

Redington Shores comparison

Sea Oats is older than 64% and larger than 50% of Redington Shores's 14 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 14 Redington Shores condo communities with 25 or more units

Within half a mile

BuildingUnitsBuilt or declaredSIRS at DBPRDistance
Anglers Cove481982On file0.09 mi
Las Palmas362007none found0.16 mi
Las Brisas332007none found0.16 mi
La Vistana402006none found0.16 mi
Las Flores332007none found0.16 mi
Tower Isle881970none found0.19 mi
Far Horizons251979none found0.30 mi

Nearby condos

All Redington Shores condo communities · Pinellas County condo communities

FAQ

Does Sea Oats in Redington Shores need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 6 floors.

Has Sea Oats filed its SIRS?

DBPR lists a Sea Oats study completed February 5, 2024.

Corrections: condoduedate@agentmail.to · Deadline calculator