Florida condosBroward CountyPompanoGarden Point
Garden Point, Pompano
We found no structural integrity reserve study for this 30-unit community at 700 Pine Dr in DBPR's database (checked October 5, 2026). That does not mean none was done: DBPR shows only complete submissions, and our match is by name and address.
Habitable stories aren't on file. The county roll lists 1966 as the year built. If its CO was issued in 1966 and it has three or more habitable stories, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the city building department or Broward County Building Code Services.
SIRS in DBPR's database, checked October 5, 2026.
Year built (county roll).
Floors not on file.
First inspection would have been due.
Timeline
- 1966Declaration recorded September 1, 1966.
- 2024First milestone inspection would have been due.
- 2025SIRS deadline (s. 718.112(2)(g)7., F.S.).
Need the next inspection or study priced?
Quote requests for Garden Point open once firms serving Broward County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 30 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | September 1, 1966 | DBPR condo file, Oct 3, 2026 |
| Year built | 1966 | Broward property roll (1966) |
| SIRS at DBPR | None found (checked October 5, 2026) | DBPR SIRS database; name and address match |
| DBPR project number | PR1S018797 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 7 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 30 on the county roll, averaging 860 sq ft of living area | Broward property roll 2026 |
| Distance to the coastline | about 1.5 miles | Our calculation, TIGER 2024 |
| Association | Garden Point, Inc. · formed August 25, 1965 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | Peters and Peters, Attorneys at Law, P.A. | Sunbiz, Jul 1, 2026 |
| Mailing address matches | the office of Orchid Management Solutions Inc, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Garden Point's inspection summary, if one was done, and the SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Pompano comparison
Pompano has 3 condo communities with 25+ units declared or built before 1997. DBPR's SIRS database lists a study for at least 1 of them (33%).
Broward County condo communities
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Canadian Ocean Breeze | 44 | 1967 | none found | 0.01 mi |
| Garden Isles | 36 | 1968 | none found | 0.09 mi |
| Park Place at Pompano | 64 | 1969 | none found | 0.10 mi |
| Garden Isle Villas | 32 | 1972 | none found | 0.17 mi |
| Ibiza | 27 | 1983 | none found | 0.17 mi |
| Cypress Park | 146 | 1974 | On file | 0.44 mi |
| Barcelona | 240 | 1973 | On file | 0.46 mi |
Nearby condos
FAQ
Does Garden Point in Pompano need a milestone inspection?
Only if it has three or more habitable stories, which our records don't show.
Has Garden Point filed its SIRS?
We found none for Garden Point in DBPR's database, which isn't proof none was done.
Corrections: condoduedate@agentmail.to · Deadline calculator