Florida condosMiami-Dade CountyNorth Miami BeachLe Frontenac

Le Frontenac, North Miami Beach

179th Drive, North Miami Beach, FL 33040 · Miami-Dade County

A structural integrity reserve study (SIRS) is on file with the state for this 70-unit community at 179th Drive, completed March 7, 2025 by an engineer (DBPR's SIRS database, as of October 5, 2026).

The association reports 6 floors and a 1991 construction year. If its certificate of occupancy (CO) was issued in 1991, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.

Yes

SIRS completed March 7, 2025.

1991

Construction year (SIRS filing).

6

Floors (SIRS filing).

2024

First inspection would have been due.

Timeline

Need the next inspection or study priced?

Quote requests for Le Frontenac open once firms serving Miami-Dade County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units70DBPR condo file, Oct 3, 2026
Declaration recordedAugust 9, 1991DBPR condo file, Oct 3, 2026
Year built1991association's SIRS filing (1991)
Floors6SIRS filing, self-reported
SIRS completedMarch 7, 2025, by an engineerDBPR SIRS database, Oct 5, 2026
DBPR project numberPR1S021340DBPR condo file, Oct 3, 2026
AssociationLe Frontenac Condo Assn Inc · formed July 22, 1991 · annual report 2026Sunbiz, Jul 1, 2026

Owners

Owners can ask the board for Le Frontenac's inspection summary, if one was done, and the March 7, 2025 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).

North Miami Beach comparison

Le Frontenac is older than 12% and larger than 38% of North Miami Beach's 165 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 165 North Miami Beach condo communities with 25 or more units

Nearby condos

All North Miami Beach condo communities · Miami-Dade County condo communities

FAQ

Does Le Frontenac in North Miami Beach need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 6 floors.

Has Le Frontenac filed its SIRS?

DBPR lists a Le Frontenac study completed March 7, 2025.

Corrections: condoduedate@agentmail.to · Deadline calculator