Florida condosMiami-Dade CountyMiamiEl Bosque at Little Havana
El Bosque at Little Havana, Miami
A structural integrity reserve study (SIRS) is on file with the state for this 82-unit community at SW 8th St & 9th Ave, completed January 22, 2025 by an engineer (DBPR's SIRS database, as of November 9, 2026).
The association reports 5 floors and a 1987 construction year. If its certificate of occupancy (CO) was issued in 1987, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed January 22, 2025.
Year built (county roll).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1987Declaration recorded January 27, 1987.
- 2024First milestone inspection would have been due.
- 2025SIRS completed January 22, 2025; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for El Bosque at Little Havana open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 82 in one building | DBPR condo file, Oct 31, 2026; building report |
| Declaration recorded | January 27, 1987 | DBPR condo file, Oct 31, 2026 |
| Year built | 1987 | Miami-Dade property roll (1987); association's SIRS filing (1987) |
| Floors | 5 | SIRS filing, self-reported |
| SIRS completed | January 22, 2025, by an engineer | DBPR SIRS database, Nov 9, 2026 |
| DBPR project number | PR1S010877 | DBPR condo file, Oct 31, 2026 |
| Unit parcels | 82 on the county roll, averaging 670 sq ft of living area | Miami-Dade property roll 2026 |
Owners
Owners can ask the board for El Bosque at Little Havana's inspection summary, if one was done, and the January 22, 2025 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
El Bosque at Little Havana is older than 48% and larger than 45% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 31, 2026).
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does El Bosque at Little Havana in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 5 floors.
Has El Bosque at Little Havana filed its SIRS?
DBPR lists a El Bosque at Little Havana study completed January 22, 2025.
Corrections: condoduedate@agentmail.to · Deadline calculator