A structural integrity reserve study (SIRS) is on file with the state for this 74-unit community at 3181 S.w. 13th Street, completed April 18, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 4 floors and a 1972 construction year. The county roll lists 1973 as the year built. If its certificate of occupancy (CO) was issued in 1972, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed April 18, 2024.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1972Declaration recorded October 14, 1972.
- 2024First milestone inspection would have been due.
- 2024SIRS completed April 18, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Alcala Plaza open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 74 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | October 14, 1972 | DBPR condo file, Oct 3, 2026 |
| Year built | 1972 | Miami-Dade property roll (1973); association's SIRS filing (1972) |
| Floors | 4 | SIRS filing, self-reported |
| SIRS completed | April 18, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S016869 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | X, minimal flood hazard | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 74 on the county roll, averaging 690 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 2 miles | Our calculation, TIGER 2024 |
| Association | Alcala Plaza Condo Assn Inc · formed October 4, 1972 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | Reinaldo Castellanos P.a | Sunbiz, Jul 1, 2026 |
Owners
Owners can ask the board for Alcala Plaza's inspection summary, if one was done, and the April 18, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami comparison
Alcala Plaza is older than 86% and larger than 41% of Miami's 980 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 980 Miami condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Marilyn S | 30 | 1993 | On file | 0.41 mi |
| Cordoba | 102 | 1972 | On file | 0.43 mi |
| International Towers | 39 | 1968 | On file | 0.49 mi |
| Coral Gardens | 318 | 1973 | none found | 0.49 mi |
Nearby condos
All Miami condo communities · Miami-Dade County condo communities
FAQ
Does Alcala Plaza in Miami need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 4 floors.
Has Alcala Plaza filed its SIRS?
DBPR lists a Alcala Plaza study completed April 18, 2024.