Florida condosMiami-Dade CountyMiami BeachKennedy House

Kennedy House, Miami Beach

1865 79th Street Cswy, Miami Beach, FL 33141 · Miami-Dade County

A structural integrity reserve study (SIRS) is on file with the state for this 230-unit community at 1865 79th Street Cswy, completed December 5, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).

The association reports 16 floors and a 1964 construction year. If its certificate of occupancy (CO) was issued in 1964, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.

Yes

SIRS completed December 5, 2024.

1964

Construction year (SIRS filing).

16

Floors (SIRS filing).

2024

First inspection would have been due.

Timeline

Need the next inspection or study priced?

Quote requests for Kennedy House open once firms serving Miami-Dade County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units230 in one buildingDBPR condo file, Oct 3, 2026; building report
Declaration recordedOctober 15, 1973DBPR condo file, Oct 3, 2026
Year built1964association's SIRS filing (1964)
Floors16SIRS filing, self-reported
SIRS completedDecember 5, 2024, by an engineerDBPR SIRS database, Oct 5, 2026
DBPR project numberPR1V004147DBPR condo file, Oct 3, 2026

Owners

Owners can ask the board for Kennedy House's inspection summary, if one was done, and the December 5, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).

Miami Beach comparison

Kennedy House is older than 76% and larger than 85% of Miami Beach's 309 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 309 Miami Beach condo communities with 25 or more units

Nearby condos

All Miami Beach condo communities · Miami-Dade County condo communities

FAQ

Does Kennedy House in Miami Beach need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 16 floors.

Has Kennedy House filed its SIRS?

DBPR lists a Kennedy House study completed December 5, 2024.

Corrections: condoduedate@agentmail.to · Deadline calculator