Madeira Cove, Madeira Beach
A structural integrity reserve study (SIRS) is on file with the state for this 60-unit community at 399 150th Avenue North, completed April 14, 2025 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 4 floors and a 1997 construction year. The county roll lists 1999 as the year built. If its certificate of occupancy (CO) was issued in 1997, its first milestone inspection is probably due by December 31, 2027 (s. 553.899(3)(a), F.S.). A local building department can require the first inspection at 25 years: check with City of Madeira Beach Building Department.
SIRS completed April 14, 2025.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 1997Declaration recorded June 16, 1997.
- 2025SIRS completed April 14, 2025; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2027First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Madeira Cove open once firms serving Pinellas County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 60 | DBPR condo file, Oct 3, 2026 |
| Declaration recorded | June 16, 1997 | DBPR condo file, Oct 3, 2026 |
| Year built | 1997 | Pinellas property roll (1999); association's SIRS filing (1997) |
| Floors | 4 | SIRS filing, self-reported |
| SIRS completed | April 14, 2025, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1P023798 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | AE, base flood elevation 11 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 60 on the county roll, averaging 1,310 sq ft of living area | Pinellas property roll 2026 |
| Distance to the coastline | about 0.3 mile | Our calculation, TIGER 2024 |
| Association | Madeira Cove Condo Assn., Inc. · formed April 29, 1997 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | Professional Bayway Management, Inc | Sunbiz, Jul 1, 2026 |
Owners
Owners can ask the board for Madeira Cove's April 14, 2025 SIRS (s. 718.112(2)(g)11., F.S.).
Madeira Beach comparison
Madeira Cove is older than 16% and larger than 72% of Madeira Beach's 25 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 25 Madeira Beach condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Boca Vista | 49 | 1983 | On file | 0.01 mi |
| Residences at Town Center | 27 | 2024 | none found | 0.02 mi |
| Harbor at Town Center | 38 | 2022 | none found | 0.03 mi |
| Snug Harbour | 48 | 2003 | On file | 0.03 mi |
| Madeira Beach Yacht Club | 286 | 1973 | On file | 0.11 mi |
| Ocean Sands | 160 | 1980 | none found | 0.22 mi |
| Surfside South | 61 | 1980 | none found | 0.24 mi |
Nearby condos
All Madeira Beach condo communities · Pinellas County condo communities
FAQ
Does Madeira Cove in Madeira Beach need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 4 floors.
Has Madeira Cove filed its SIRS?
DBPR lists a Madeira Cove study completed April 14, 2025.
Corrections: condoduedate@agentmail.to · Deadline calculator