Florida condosSarasota CountyLongboat KeyFairway Bay

Fairway Bay, Longboat Key

Bay Isles Blvd., Longboat Key, FL 33548 · Sarasota County

A structural integrity reserve study (SIRS) is on file with the state for this 124-unit community at Bay Isles Blvd., completed December 19, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).

The association reports 5 floors and a 1982 construction year. If its certificate of occupancy (CO) was issued in 1982, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.

Yes

SIRS completed December 19, 2024.

1982

Construction year (SIRS filing).

5

Floors (SIRS filing).

2024

First inspection would have been due.

Timeline

Need the next inspection or study priced?

Quote requests for Fairway Bay open once firms serving Sarasota County sign on. How requests will work.

Quote requests open soon

Facts and sources

FactValueSource
Units124 in one buildingDBPR condo file, Oct 3, 2026; building report
Declaration recordedNovember 17, 1982DBPR condo file, Oct 3, 2026
Year built1982association's SIRS filing (1982)
Floors5SIRS filing, self-reported
SIRS completedDecember 19, 2024, by an engineerDBPR SIRS database, Oct 5, 2026
DBPR project numberPR1P009367DBPR condo file, Oct 3, 2026
AssociationFairway Bay Assn Inc · formed October 13, 1981 · annual report 2026Sunbiz, Jul 1, 2026

Owners

Owners can ask the board for Fairway Bay's inspection summary, if one was done, and the December 19, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).

Longboat Key comparison

Fairway Bay is older than 34% and larger than 88% of Longboat Key's 73 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).

All 73 Longboat Key condo communities with 25 or more units

Nearby condos

All Longboat Key condo communities · Sarasota County condo communities

FAQ

Does Fairway Bay in Longboat Key need a milestone inspection?

Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 5 floors.

Has Fairway Bay filed its SIRS?

DBPR lists a Fairway Bay study completed December 19, 2024.

Corrections: condoduedate@agentmail.to · Deadline calculator