Reunion Grande, Kissimmee
A structural integrity reserve study (SIRS) is on file with the state for this 82-unit community at 7593 Gathering Drive, completed October 25, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
The association reports 10 floors and a 2007 construction year. If its certificate of occupancy (CO) was issued in 2007, its first milestone inspection is probably due by December 31, 2037 (s. 553.899(3)(a), F.S.).
SIRS completed October 25, 2024.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2007Declaration recorded January 12, 2007.
- 2024SIRS completed October 25, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2037First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Reunion Grande open once firms serving Osceola County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 82 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | January 12, 2007 | DBPR condo file, Oct 3, 2026 |
| Year built | 2007 | association's SIRS filing (2007) |
| Floors | 10 | SIRS filing, self-reported |
| SIRS completed | October 25, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR70709 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | X, minimal flood hazard | FEMA flood layer, Oct 5, 2026 |
| Distance to the coastline | about 56.5 miles | Our calculation, TIGER 2024 |
Owners
Owners can ask the board for Reunion Grande's October 25, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Kissimmee comparison
Reunion Grande is older than 10% and larger than 27% of Kissimmee's 59 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
Nearby condos
All Kissimmee condo communities · Osceola County condo communities
FAQ
Does Reunion Grande in Kissimmee need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 10 floors.
Has Reunion Grande filed its SIRS?
DBPR lists a Reunion Grande study completed October 25, 2024.