Florida condosBrevard CountyIndialanticSea Pearl
Sea Pearl, Indialantic
A structural integrity reserve study (SIRS) is on file with the state for this 27-unit community at 1575 North Highway A1A, completed September 23, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
The association reports 8 floors and a 1997 construction year. If its certificate of occupancy (CO) was issued in 1997, its first milestone inspection is probably due by December 31, 2027 (s. 553.899(3)(a), F.S.). A local building department can require the first inspection at 25 years: check with the city or county building department.
SIRS completed September 23, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 1997Declaration recorded May 14, 1997.
- 2024SIRS completed September 23, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2027First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Sea Pearl open once firms serving Brevard County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 27 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | May 14, 1997 | DBPR condo file, Oct 3, 2026 |
| Year built | 1997 | Brevard property roll (1997); association's SIRS filing (1997) |
| Floors | 8 | SIRS filing, self-reported |
| SIRS completed | September 23, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S023607 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | X, minimal flood hazard | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 27 on the county roll, averaging 1,960 sq ft of living area | Brevard property roll 2026 |
| Distance to the coastline | about 0.1 mile | Our calculation, TIGER 2024 |
| Association | Sea Pearl of Brevard Condo Assn Inc · formed July 5, 1996 · annual report 2026 | Sunbiz, Jul 1, 2026 |
| Registered agent | Advanced Property Management | Sunbiz, Jul 1, 2026 |
| Mailing address matches | the office of Advanced Property Management of Central Florida Inc, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Sea Pearl's September 23, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Indialantic comparison
Sea Pearl is older than 35% and larger than 4% of Indialantic's 23 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
All 23 Indialantic condo communities with 25 or more units
Within half a mile
| Building | Units | Built or declared | SIRS at DBPR | Distance |
|---|---|---|---|---|
| Majestic Shores | 38 | 1996 | none found | 0.00 mi |
| Reef | 49 | 1978 | none found | 0.01 mi |
| Jade Palm | 50 | 1998 | none found | 0.01 mi |
| Commondore Club | 50 | 1980 | none found | 0.02 mi |
| Indialantic Villas | 48 | 1981 | none found | 0.34 mi |
| Villager | 97 | 1976 | none found | 0.40 mi |
| Marenda | 35 | 2015 | On file | 0.40 mi |
Nearby condos
All Indialantic condo communities · Brevard County condo communities
FAQ
Does Sea Pearl in Indialantic need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 8 floors.
Has Sea Pearl filed its SIRS?
DBPR lists a Sea Pearl study completed September 23, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator