Florida condosBrevard CountyCocoa BeachRiver Bend
River Bend, Cocoa Beach
A structural integrity reserve study (SIRS) is on file with the state for this 52-unit community at 301 Highway A1A, completed August 26, 2024 by a reserve specialist (DBPR's SIRS database, as of October 5, 2026).
The association reports 4 floors and a 2001 construction year. If its certificate of occupancy (CO) was issued in 2001, its first milestone inspection is probably due by December 31, 2031 (s. 553.899(3)(a), F.S.). A local building department can require the first inspection at 25 years: check with City of Cocoa Beach Building Department.
SIRS completed August 26, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2001Declaration recorded October 9, 2001.
- 2024SIRS completed August 26, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2031First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for River Bend open once firms serving Brevard County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 52 in one building | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | October 9, 2001 | DBPR condo file, Oct 3, 2026 |
| Year built | 2001 | Brevard property roll (2001); association's SIRS filing (2001) |
| Floors | 4 | SIRS filing, self-reported |
| SIRS completed | August 26, 2024, by a reserve specialist | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1S025593 | DBPR condo file, Oct 3, 2026 |
| Unit parcels | 51 on the county roll, averaging 2,200 sq ft of living area | Brevard property roll 2026 |
| Association | River Bend Condo Assn of Brevard, Inc · formed October 15, 2001 · annual report 2026 | Sunbiz, Jul 1, 2026 |
Owners
Owners can ask the board for River Bend's August 26, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Cocoa Beach comparison
River Bend is older than 6% and larger than 58% of Cocoa Beach's 78 communities with 25+ units (our calculation from the DBPR condo file, Oct 3, 2026).
Nearby condos
All Cocoa Beach condo communities · Brevard County condo communities
FAQ
Does River Bend in Cocoa Beach need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 4 floors.
Has River Bend filed its SIRS?
DBPR lists a River Bend study completed August 26, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator