Florida condosEscambia CountyPensacolaSandy Key
Sandy Key, Pensacola
A structural integrity reserve study (SIRS) is on file with the state for this 183-unit community at Rural Route 01 Box 1050, completed September 25, 2024 by an engineer (DBPR's SIRS database, as of November 9, 2026).
The association reports 8 floors and a 1983 construction year. If its certificate of occupancy (CO) was issued in 1982, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed September 25, 2024.
Declaration year, before the 1983 year built.
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1982Declaration recorded November 3, 1982.
- 2024First milestone inspection would have been due.
- 2024SIRS completed September 25, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Sandy Key open once firms serving Escambia County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 183 | DBPR condo file, Oct 31, 2026 |
| Declaration recorded | November 3, 1982 | DBPR condo file, Oct 31, 2026 |
| Year built | 1983 | association's SIRS filing (1983) |
| Floors | 8 | SIRS filing, self-reported |
| SIRS completed | September 25, 2024, by an engineer | DBPR SIRS database, Nov 9, 2026 |
| DBPR project number | PR1P012473 | DBPR condo file, Oct 31, 2026 |
| Mailing address matches | the office of Perdido Sand Realty, Inc., a licensed manager firm | DBPR CAM file, Oct 28, 2026; address match only |
Owners
Owners can ask the board for Sandy Key's inspection summary, if one was done, and the September 25, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Pensacola comparison
Sandy Key is older than 75% and larger than 99% of Pensacola's 79 communities with 25+ units (our calculation from the DBPR condo file, Oct 31, 2026).
Nearby condos
All Pensacola condo communities · Escambia County condo communities
FAQ
Does Sandy Key in Pensacola need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 8 floors.
Has Sandy Key filed its SIRS?
DBPR lists a Sandy Key study completed September 25, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator