Florida condosEscambia CountyPensacola BeachPortofino Tower
Portofino Tower, Pensacola Beach
A structural integrity reserve study (SIRS) is on file with the state for this 153-unit community at 3 Portofino Dr, completed September 24, 2024 by an engineer (DBPR's SIRS database, as of November 9, 2026).
The association reports 22 floors and a 2004 construction year. If its certificate of occupancy (CO) was issued in 2004, its first milestone inspection is probably due by December 31, 2034 (s. 553.899(3)(a), F.S.).
SIRS completed September 24, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2004Declaration recorded April 5, 2004.
- 2024SIRS completed September 24, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2034First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Portofino Tower open once firms serving Escambia County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 153 in one building | DBPR condo file, Oct 31, 2026; building report |
| Declaration recorded | April 5, 2004 | DBPR condo file, Oct 31, 2026 |
| Year built | 2004 | Escambia property roll (2004); association's SIRS filing (2004) |
| Floors | 22 | SIRS filing, self-reported |
| SIRS completed | September 24, 2024, by an engineer | DBPR SIRS database, Nov 9, 2026 |
| DBPR project number | PR1U025521 | DBPR condo file, Oct 31, 2026 |
| FEMA flood zone | AE, base flood elevation 10 ft (high risk, special flood hazard area) | FEMA flood layer, Oct 5, 2026 |
| Unit parcels | 153 on the county roll, averaging 1,580 sq ft of living area | Escambia property roll 2026 |
| Distance to the coastline | about 0.2 mile | Our calculation, TIGER 2024 |
| Association | Portofino Tower Three Homeowners Assn at Pensacola Beach Inc · formed January 21, 1999 · annual report 2026 | Sunbiz, Oct 7, 2026 |
Owners
Owners can ask the board for Portofino Tower's September 24, 2024 SIRS (s. 718.112(2)(g)11., F.S.).
Pensacola Beach comparison
Portofino Tower is older than 17% and larger than 72% of Pensacola Beach's 18 communities with 25+ units (our calculation from the DBPR condo file, Oct 31, 2026).
All 18 Pensacola Beach condo communities with 25 or more units
Nearby condos
All Pensacola Beach condo communities · Escambia County condo communities
FAQ
Does Portofino Tower in Pensacola Beach need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 22 floors.
Has Portofino Tower filed its SIRS?
DBPR lists a Portofino Tower study completed September 24, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator