Florida condosMiami-Dade CountyMiami SpringsSprings Towers
Springs Towers, Miami Springs
A structural integrity reserve study (SIRS) is on file with the state for this 43-unit community at 680-685 Miller Drive, completed December 10, 2024 by an engineer (DBPR's SIRS database, as of October 5, 2026).
The association reports 4 floors and a 1967 construction year. If its certificate of occupancy (CO) was issued in 1967, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the city building department or Miami-Dade County Regulatory and Economic Resources, Building.
SIRS completed December 10, 2024.
Year built (county roll).
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1981Declaration recorded June 1, 1981.
- 2024First milestone inspection would have been due.
- 2024SIRS completed December 10, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Springs Towers open once firms serving Miami-Dade County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 43 in 2 buildings | DBPR condo file, Oct 3, 2026; building report |
| Declaration recorded | June 1, 1981 | DBPR condo file, Oct 3, 2026 |
| Year built | 1967 | Miami-Dade property roll (1967); association's SIRS filing (1967) |
| Floors | 4 | SIRS filing, self-reported |
| Units per building | 44, 44 | SB 4-D report, Oct 5, 2026 |
| SIRS completed | December 10, 2024, by an engineer | DBPR SIRS database, Oct 5, 2026 |
| DBPR project number | PR1V003994 | DBPR condo file, Oct 3, 2026 |
| FEMA flood zone | X, minimal flood hazard | FEMA flood layer, Oct 5, 2026 |
| Building addresses | 680 Miller Drive (44); 685 Miller Drive (44) | SB 4-D report, Oct 5, 2026 |
| Unit parcels | 19 on the county roll, averaging 800 sq ft of living area | Miami-Dade property roll 2026 |
| Distance to the coastline | about 1 mile | Our calculation, TIGER 2024 |
| Mailing address matches | the office of CAM Management Services Corp, a licensed manager firm | DBPR CAM file, Sep 30, 2026; address match only |
Owners
Owners can ask the board for Springs Towers's inspection summary, if one was done, and the December 10, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Miami Springs comparison
Miami Springs has 3 condo communities with 25+ units declared or built before 1997. DBPR's SIRS database lists a study for at least 1 of them (33%).
Nearby condos
FAQ
Does Springs Towers in Miami Springs need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 4 floors.
Has Springs Towers filed its SIRS?
DBPR lists a Springs Towers study completed December 10, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator