A structural integrity reserve study (SIRS) is on file with the state for this 75-unit community at 1365 Highway 98 East, completed September 26, 2023 by an engineer (DBPR's SIRS database, as of November 9, 2026).
The association reports 5 floors and a 2005 construction year. If its certificate of occupancy (CO) was issued in 2005, its first milestone inspection is probably due by December 31, 2035 (s. 553.899(3)(a), F.S.).
SIRS completed September 26, 2023.
Construction year (SIRS filing).
Floors (SIRS filing).
First inspection is probably due.
Timeline
- 2005Declaration recorded January 27, 2005.
- 2023SIRS completed September 26, 2023; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
- 2035First milestone inspection is probably due.
Need the next inspection or study priced?
Quote requests for Intercoastal Pointe open once firms serving Okaloosa County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 75 in one building | DBPR condo file, Oct 31, 2026; building report |
| Declaration recorded | January 27, 2005 | DBPR condo file, Oct 31, 2026 |
| Year built | 2005 | association's SIRS filing (2005) |
| Floors | 5 | SIRS filing, self-reported |
| SIRS completed | September 26, 2023, by an engineer | DBPR SIRS database, Nov 9, 2026 |
| DBPR project number | PR1P026663 | DBPR condo file, Oct 31, 2026 |
| FEMA flood zone | X, minimal flood hazard | FEMA flood layer, Oct 5, 2026 |
| Distance to the coastline | about 1 mile | Our calculation, TIGER 2024 |
Owners
Owners can ask the board for Intercoastal Pointe's September 26, 2023 SIRS (s. 718.112(2)(g)11., F.S.).
Mary Esther comparison
Mary Esther has 2 condo communities with 25+ units in the registry, none built or declared before 1997.
Nearby condos
FAQ
Does Intercoastal Pointe in Mary Esther need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 5 floors.
Has Intercoastal Pointe filed its SIRS?
DBPR lists a Intercoastal Pointe study completed September 26, 2023.
Corrections: condoduedate@agentmail.to · Deadline calculator