Florida condosOkaloosa CountyDestinShoreline Towers
Shoreline Towers, Destin
A structural integrity reserve study (SIRS) is on file with the state for this 195-unit community at NONE PO Box 414, completed August 20, 2024 by an engineer (DBPR's SIRS database, as of November 9, 2026).
The association reports 12 floors and a 1975 construction year. If its certificate of occupancy (CO) was issued in 1973, its first milestone inspection would have been due by December 31, 2024 (s. 553.899(3)(a), F.S.). Whether it was done is on file with the local building official.
SIRS completed August 20, 2024.
Declaration year, before the 1975 year built.
Floors (SIRS filing).
First inspection would have been due.
Timeline
- 1973Declaration recorded October 12, 1973.
- 2024First milestone inspection would have been due.
- 2024SIRS completed August 20, 2024; the next is due within 10 years (s. 718.112(2)(g)1., F.S.).
Need the next inspection or study priced?
Quote requests for Shoreline Towers open once firms serving Okaloosa County sign on. How requests will work.
Quote requests open soonFacts and sources
| Fact | Value | Source |
|---|---|---|
| Units | 195 in one building | DBPR condo file, Oct 31, 2026; building report |
| Declaration recorded | October 12, 1973 | DBPR condo file, Oct 31, 2026 |
| Year built | 1975 | association's SIRS filing (1975) |
| Floors | 12 | SIRS filing, self-reported |
| SIRS completed | August 20, 2024, by an engineer | DBPR SIRS database, Nov 9, 2026 |
| DBPR project number | PR1M005258 | DBPR condo file, Oct 31, 2026 |
Owners
Owners can ask the board for Shoreline Towers's inspection summary, if one was done, and the August 20, 2024 SIRS (s. 553.899(9) and s. 718.112(2)(g)11., F.S.).
Destin comparison
Shoreline Towers is older than 94% and larger than 88% of Destin's 128 communities with 25+ units (our calculation from the DBPR condo file, Oct 31, 2026).
Nearby condos
All Destin condo communities · Okaloosa County condo communities
FAQ
Does Shoreline Towers in Destin need a milestone inspection?
Yes, at 30 years from its certificate of occupancy, if it has three or more habitable stories; its SIRS filing reports 12 floors.
Has Shoreline Towers filed its SIRS?
DBPR lists a Shoreline Towers study completed August 20, 2024.
Corrections: condoduedate@agentmail.to · Deadline calculator